Saturday, November 7, 2009

Day 31



Well its day 31 of the 14 day remodel. So far all has gone pretty well. We have had a couple of electrical glitches but nothing serious. The major work is complete. The arches are in place, Joseph’s new door is installed and yesterday, the walls were painted. Today, we realized that we didn’t have enough floor boards. Went to buy some new ones and of course nobody sells them anymore. We ended up purchasing all new ones. But Julie likes them better. Today the floor boards were installed, the paint was touched up and the ladder was put back.



During construction, life has continued. We took a trip to Kotovsk (a city in the north) with our team, Micah got sick, the schools were closed (not because of our remodel) and Alfie continues to teach at the seminary. We are beginning to feel like we live in a house and not a construction zone again. That is indeed a good feeling.

Wednesday, October 21, 2009

Day 15


The remodel continues. The hall is starting to look like a hall again. Alfie went to Kiev last Friday for a meeting, the girls spent the night at a friends and Joseph spent the weekend with other friends. Alfie returned on Saturday. Half the team took a trip to Frunzevka on Saturday. We all went to church in Odessa on Sunday. On Sunday night our team-mates returned. Leah joined us and we went to a small church just outside Odessa for the evening service.

Meanwhile, the remodel continues. We are living in the apartment again. We actually have most of the time. Most of the electrical work is done and the worst of the dust is done now. When we are home, we spend most of the time in the kitchen. The living room is really not usable and the bedrooms are cold. We hope the heat will be one soon. Anyway, the hall looks good. Soon we will paint, and then it’s clean, clean, and clean.

Wednesday, October 14, 2009

Day 8




We have moved back home. We try not to be home during the day because it is too noisy, however the evenings are not bad. The beds, furniture and kitchen are covered with plastic. The electrical work is almost done. The new breaker-box was installed today and most of the apartment is wired. Below is our builder – Vitalik.


Saturday, October 10, 2009

Day 4


It is just amazing what can be accomplished in four days. They not only finished our hallway they raised the ceiling about five feet and added at least eight rooms. OK, I’m only kidding. We are staying in the seminary dorm for the weekend. I don’t have any pictures but much has been accomplished. We even had a small fire. The fire didn’t cause any damage but it did identify another problem that needs to be addressed.

Thursday, October 8, 2009

Day 1

Alfie gave two lectures at the seminary and had one Russian language lesson while our electrician, Andrei, tore apart our hallway. He told us there would be a lot of dust and he was right. He said that this first day he was trying to do all the major dust work. He had to search for the existing wires that have been plastered inside the existing walls. That means starting at a junction box and breaking the plaster with a hammer until you can tell where the wires go to. He made a whole for our new breaker box and installed six new plugs, seven new switches and many other things. Here is what the hall looked like at the end of the day. There is also a picture of Andrei our electrician. I will not post picture for Day 2 because I’m just getting day 1 photos up. However, day 2 Andrei’s drill broke but he still got much work done. He ran most of the necessary cables and the hall is now ready for the building to come destroy and rebuild. The looks about the same but a little cleaner with wires hanging everywhere.

Tuesday, October 6, 2009

Day 0

We have to upgrade our electrical system in our apartment. We can’t do the entire apartment so we are just going to rewire the corridor. And since we are going to have to tear up the hallway we might as well put it back together in better shape than we found it. What that means is that we are about to live through a significant remodel. We will be adding a new breaker box, copper wiring, light switches, plugs, three arches, removing several doors, rebuilding a closet, installing recessed lights, new paint and so one. We hope to be done in about two weeks. We will see…. Here is the current state of our corridor.

Wednesday, September 30, 2009

A Typical Day?

People often ask me what a typical day in Odessa is like. This is a difficult question to answer. It is difficult to answer because I don’t have many typical days. I have ordinary days, boring days, exciting days, sad days and sometimes even restful days. Every now and then I have extraordinary days. I had two of them recently. The second was on a Thursday.
It started as an ordinary day. There was a medical team here from the US. They arrived the Saturday before and because of my schedule I was not able to accompany them. While I was busy in Odessa they were running clinics in small cities and villages in the northern part of the Odessa region. I was getting good reports and on Thursday I had the opportunity to join them. There was a group of three public school teachers and a missionary making the three hour drive to the city of Krosnii Oknii to present a ministry opportunity to the local public school. The medical team was going to be in the same city so the plan was for me to catch a ride with the teachers and meet up with the team. When we met that morning, one of the teachers, Tanya had a headache. She took a couple of advil; we got in the car and were off. The trip started out normal enough. Two of the teachers I met just that morning so the conversation was just “getting to know you” stuff. After about an hour Tanya didn’t feel any better. She asked to stop the car. We stopped and she got sick. The next time we stopped at a pharmacy and purchased some more medicine. Well the medicine didn’t help and Tanya got worse and worse. She developed a fever, her neck began to hurt and she felt weaker and weaker. When we got to Krosnii Oknii we went straight to the hospital. When we took her in she could barely walk. The doctors were very attentive but she kept getting worse. They needed to run some tests so we went and did the presentation. We figured that we would decide how to get her back to Odessa once we know more from the tests.
The presentation went great. But, by the time we returned to the hospital, Tanya had been moved to the infectious disease unit and had lapsed into a coma. The doctors were not sure what was wrong and said that she needs to get back to a hospital in Odessa right away. As we were discussing options, I began to wonder if we were going to have to take her lifeless body back to Odessa. This was an unsettling thought. I have never faced a situation quite like this. Well, we kept exploring options. After several discussions and phone calls we realized that the only way to get her back to Odessa that same day was to hire a private ambulance company. We called the company and they said that they could come and get her but they wanted the money up front. Her husband didn’t have any money so that started a new flurry of phone calls. Thankfully, Julie was in Odessa. She was able to gather the money and get it to Dima, Tanya’s husband. He got the money to the ambulance company and by 3:00am on Friday, Tanya was in Odessa. We hear that she is doing better. She, at least, is not in a coma. We are praying for her and waiting on test results.
This certainly was not a typical day, but I rarely have a typical day. In fact, my point is, “What is a typical day?” Each day I think I know what will happen but I am learning to hold those plans loosely.